The Problem: Misaligned Pipes
Sometimes during irrigation repairs, you'll find that two pipe ends simply don't line up. Maybe the ground shifted, a previous repair went wrong, or the original installation wasn't perfect. Instead of forcing the pipes (which causes stress cracks) or using expensive specialty fittings, two 45-degree fittings give you a clean, professional solution.
- No Stress on Pipes: The angled connection accommodates the offset naturally
- Permanent Fix: Cemented joints are as strong as the original pipe
- Inexpensive: Two 45-degree fittings cost just a few dollars
- Professional Results: This is how the pros handle misaligned connections
Tools Needed
- PVC pipe cutter or hacksaw
- Measuring tape
- Marker or pencil
- Shovel (for buried pipes)
- Rag or towel
Shop Lowe's Collection
Shop All Parts at Lowe's
As a Lowe's affiliate, I earn from qualifying purchases. This does not affect your price.
Video Tutorial
Watch me demonstrate how to use 45-degree fittings to connect misaligned PVC pipes.
Why Two 45-Degree Fittings?
When pipes are offset, using two 45-degree fittings creates an "S-curve" or "offset" that smoothly bridges the gap:
- Combined angle: Two 45s can redirect flow up to 90 degrees total, but rotated to create lateral offset
- Adjustable offset: The length of pipe between the fittings determines how much offset you achieve
- Better than 90s: 45-degree angles cause less turbulence and pressure drop than sharp 90-degree turns
- Versatile: By rotating the fittings, you can offset in any direction - up, down, or sideways
Don't Force Misaligned Pipes!
Never try to bend or force PVC pipes to line up. This creates stress on the joints and pipe walls, leading to cracks and leaks over time - sometimes months later. The 45-degree fitting method eliminates all stress on the system.
1 Assess the Misalignment
Before cutting anything, understand your offset:
- Measure the horizontal distance between the two pipe centerlines
- Note if there's also a vertical offset (up/down difference)
- Determine the direction you need to shift the connection
- Make sure you have enough pipe length to work with on both ends
Pro Tip
For small offsets (1-2 inches), a short connector pipe between the 45s works. For larger offsets, you'll need a longer piece between the fittings.
2 Prepare the Pipe Ends
- Cut the existing pipes to create clean, square ends
- Remove any damaged sections
- Clean debris from inside and outside the pipe ends
- Make sure the pipes are dry before cementing
Leave enough length on both pipes to accept the 45-degree fittings.
3 Dry-Fit the Assembly
Before using any cement, assemble everything to check the fit:
- Connect the first 45-degree fitting to one pipe end
- Add a short pipe section to that fitting
- Attach the second 45-degree fitting
- Rotate both fittings until the assembly reaches the other pipe
- Adjust the connector pipe length if needed
Finding the Right Angle
During dry-fit, rotate the fittings to find the sweet spot where everything lines up. Mark the positions with a marker so you can replicate them when cementing.
4 Apply Primer and Cement
Work one joint at a time, starting from one end:
- Apply purple primer to the pipe end and inside the fitting
- Apply PVC cement to both primed surfaces
- Push the fitting onto the pipe with a quarter turn
- Hold for 30 seconds
- Repeat for the connector pipe and second 45-degree fitting
Work Quickly!
PVC cement sets fast. If you need to adjust the angle, do it immediately after pushing the fitting on. Once it sets, you can't move it.
5 Make the Final Connection
- Prime and cement the last joint
- Rotate the assembly into position to meet the second pipe
- Push firmly and hold for 30 seconds
- Wipe away any excess cement
The assembly should now smoothly connect both misaligned pipes without any stress on the system.
6 Cure and Test
Allow proper cure time before pressurizing:
- Initial set: 2 minutes - don't move the joints
- Handling: 15-30 minutes
- Pressure test: Wait at least 2 hours
- Best practice: 24 hours for full cure
Turn on water slowly and inspect all joints for leaks before backfilling.
When to Use 45-Degree Fittings
- Offset pipes: When two pipe ends are parallel but not in line
- Height differences: When one pipe is higher than the other
- Obstacle avoidance: When you need to route around a rock or root
- Repair corrections: When fixing a previous bad repair that left pipes misaligned
- Ground settling: When soil movement has shifted pipes over time
Alternative Solutions
45-degree fittings aren't the only option. Here's when to consider alternatives:
- Flexible coupling: For very small misalignments (less than 1/2 inch)
- Swing joint: For risers that need adjustment (like sprinkler heads)
- 22.5-degree fittings: For subtle offsets that don't need much angle
- Dig and realign: If the misalignment is due to one pipe being out of position, sometimes it's easier to dig out more and reposition the pipe
Common Mistakes to Avoid
- Not dry-fitting first: Always test the assembly before cementing
- Forgetting to mark positions: Mark fitting orientations during dry-fit so you can replicate them
- Connector pipe too short: This limits your offset range - it's better to have extra length
- Rushing the cement: You have seconds to position fittings correctly - be ready
- Not accounting for fitting depth: Pipe inserts about 1 inch into each fitting - factor this into measurements
Get Your Supplies at Lowe's
Everything you need for misaligned pipe repairs - 45-degree fittings, cement, primer, and pipe.
Shop PVC Pipe Repair Collection
As a Lowe's affiliate, I earn from qualifying purchases. Prices and availability may vary.